Type:
engine
Part number:
MWM TCG2020V20 2MW 50Hz
Catalog number of the original:
MWM TCG2020V20 ; CG170-20; 2MW 50Hz
Spare part type:
original spare part
Year of manufacture:
05/2024
Location:
Austria Hörsching
Placed on:
Jun 30, 2024
Seller stock ID:
MWM TCG2020V20
Description
Engine power:
2650 HP
Number of cylinders:
2
Engine type:
V-type
Turbo:
Fuel:
gas
Euro:
5
Engine
Power:
2650 HP (1948 kW)
Turbo:
Euro:
Euro 5
Condition
Condition:
remanufactured
Warranty::
1 year
Important
This offer is for guidance only. Please request more precise information from the seller.
Purchase tips
Seller's contacts
Subscribe to seller
R.Schwarzmuller
Languages:
English
+358 50 53...
Show
+358 50 5345498
+358 9 231...
Show
+358 9 23165797
Address
Austria, Vienna, 4063, Hörsching, Flughafenstrasse 3
Seller's local time:
11:01 pm (CEST)
Send message
Seller's contacts
ETC EUROPE TRUCK FINLAND OY
Austria
8 years at Machineryline
Subscribe to seller
+358 50 53...
Show
+358 50 5345498
+358 9 231...
Show
+358 9 23165797
Ask the seller
PDF
Share
Facebook
WhatsApp
Viber
Telegram
Selling machinery or vehicles?
You can do it with us!
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.
Cat (MWM) TCG2020V20 2MW 50Hz
voltage 400V - 03 units
voltage 10.5kV - 07 units.
Fully overhauled gensets E70 by MWM officials. Painted finished originally.
0 hours with factory warranty 12 months.
(all old core basic units was 2011-2014 yom with up to 45k w/hours before)
Delivery time : 3-4 months after the order. and advance 50%
Full E70 maintenance and cyclical operating inspection of gas engines and generators ensures the performance of the power plants by means of professional maintenance measures. The E70 general overhaul of the MWM TCG2020V20 gas engine secures the full performance of the engine further.
With fully refurbished MWM X-Change gas engines, power plants can be re-commissioned within a very short time for a speedy return to related operation. MWM factory service refurbish used gas engines with original parts , restoring them to the state of the art. The service includes a 12-month factory warranty.